Looking for the best trails around Paducah?

Explore the best rated trails in Paducah, KY. Whether you're looking for an easy walking trail or a bike trail like the Tunnel Hill State Trail and Paducah Greenway . With more than 8 trails covering 85 miles you're bound to find a perfect trail for you. Click on any trail below to find trail descriptions, trail maps, photos, and reviews.

Recent Trail Reviews

Lake Barkley Bridge Multiuse Path

Fun & Safe Riding Path

May, 2023 by rjurdak

Not sure why this trail is called Lake Barkley Multi-use Path as it actually begins at the Kentucky Lake portion of Land Between the Lakes (LBL). Regardless, we rode a total of 13 miles back & forth along this path taking in the beautiful lake scenery. After crossing the lake toward Fenton we considered riding over toward the LBL visitor center. However, being the Memorial Day weekend auto traffic was rather hectic so we opted to forego that portion of our ride and simply rode back across the bridge a few times. Tomorrow we’re heading toward Lake Barkley and plan to ride that area as it appears there’s a protected longer riding trail in that direction. Worth it !!!

George Rogers Clark Discovery Trail

nice short trail

October, 2022 by wmclarin

All concrete well maintained and flat. Nice trail

Tunnel Hill State Trail

Tunnel Hill Trail Review

September, 2022 by dynomight

My husband and I rode this trail on 9/6/2022 and 9/7/2022. The first day we caught the trail from our hotel in Harrisburg and got about 4 miles south of Carrier Mills. The trail is in pretty decent shape. It's crushed stone, but could use some minor maintenance, as the underlayment in some areas is exposed and has larger rocks poking through. The first day we rode my husband ended up with 2 flat tires, due to the larger rocks. The second day we rode from Stonefort to Belknap. It was a beautiful ride. There is the tunnel in Tunnel Hill plus many bridges along the way. The area is mostly shaded as well. Vienna has a nice park, with flushable toilets. Just a note: we did walk part of the trail from our hotel in Harrisburg 1.5 miles north and we did hit a bridge on the trail that did seem unsafe, many of the planks need to be replaced, there were chunks missing out of several of the planks.

Accordion

Tunnel Hill State Trail

Vienna to New Burnside and back.

July, 2022 by jd.kinsel

My husband and I rode on a pretty hot afternoon because it had rained in the morning. We took plenty of water and snacks. The trail was a bit cooler because of tree cover, this would be so pretty in the fall. We were able to stop at Sandburn Junction for a frozen treat on the way and water on the way back. We weren’t sure if the pump water at New Burnside and Tunnel Hill was safe to drink. Great ride even with the heat

Cadiz Railroad Trail

route very bumpy

June, 2022 by qvmh8ysqhv

Ok route. I would recommended parking in the school lot. Otherwise you cross a busy road. Need a trail, hybrid or mountain for the trail by the railroad

Lake Barkley Bridge Multiuse Path

bridge cool

June, 2022 by qvmh8ysqhv

Some cool tunnels and bridge cool Golden pond route nice too

Tunnel Hill State Trail

It's not 5 stars

June, 2022 by campbell1970

Rode it on June 10, 2022 from Cache River Wetland Center to Vienna, IL a distance of approx. 27 miles round trip. The trail is fairly straight and level with plenty of shade, beautiful scenery and wildlife. BUT, it is covered with crushed limestone which has been allowed to accumulate in the track to a dept of 1 to 2 inches in places. Additionally, some idiot has used white rock to fill in places. If you have thin tries, I would not recommend this portion of the trail. It needs to be graded and compacted, then it would be 5 stars.

Tunnel Hill State Trail

Scenic and Peaceful

May, 2022 by gailprete

Over two days, rode from the southern end at the Barkhausen Cache River Wetlands Center north to Stonefort. Beautiful scenery, lots of birds and very peaceful, encountered only a few other riders and walkers.

George Rogers Clark Discovery Trail

Beautiful area and April 8, 2022 lost dog Rosebud. Has on Grey reflective collar and tags and orange harness. Very fearful and will run. Please call with any sightings. 231 920-0735.

April, 2022 by plangdon.55

Beautiful area and April 8, 2022 lost dog Rosebud. Has on Grey reflective collar and tags and orange harness. Very fearful and will run. Please call with any sightings. 231 920-0735.

Paducah Greenway

A Flat, Smooth Ride with Great Vistas of the Ohio River

March, 2022 by mosesmapmaker

The trail is a nice five-mile ride. I went on the second day of spring, but it must look even better when there is more foliage along the path. Unless it's unusually busy, I recommend parking by the riverfront mural wall downtown just off Broadway. The mural in the tunnel is a nice touch. As an extra excursion, you can take an extra loop in Noble Park or the County Park, where there is a mountain bike course. Noble Park gets busy on balmy weekends and holidays, so look out for traffic. There is talk of extending the trail southward from the west endpoint of the trail, so don't think that you've necessarily done the whole trail if you happen to return in a few years. If you happen to stop in Noble Park, be sure to bring discs if you want to play some frisbee golf on the 18-hole course. Also, a walk on the brick-surfaced sidewalks on Broadway downtown offers some breathtaking historical scenery.

George Rogers Clark Discovery Trail

Massac Creek bridge now open

October, 2021 by vmd9jfggxj

The bridge over Massac Creek has been replaced and fully open. This connects Fort Massac State Park to the concrete paved former railroad bed section of the trail and can continue on east to Brookport IL via county road and city streets. The concrete railroad bed section of the trail is the only section motorized vehicle prohibited. All other sections are shared with vehicle traffic. Note the stop signs have been stolen at the Belgrade Road crossing. This is the parking area with restrooms midway of the concrete trail section. Caution the traffic crossing the trail does not stop.

Paducah Greenway

September 23, 2021 trail still truncated by construction

September, 2021 by bluegrasslass

We parked in the public lot by the muraled flood wall but could only ride part of the trail to the west to where construction blocked us from continuing. The Detour sign led us to busy 45, with no indication of where the detour led. 45 has no shoulder or sidewalks. We missed half of the trail. Park at the west end, in Noble Park and ride east.

Find Nearby City trails

Register for free!

Register for free with TrailLink today!

We're a non-profit all about helping you enjoy the outdoors
  • View over 40,000 miles of trail maps
  • Share your trail photos
  • Save your own favorite trails
  • Learn about new trails near you
  • Leave reviews for trails
  • Add new and edit existing trails

Get the Free TrailLink App

The trail is always better with TrailLink

Scan the QR code to get TrailLink on your phone

Explore by City

Explore by City

Explore by Activity

Explore by Activity

Log in to your account to:

  • View trail paths on the map
  • Save trails to your account
  • Add trails, edit descriptions
  • Share photos
  • Add reviews

Log in with Google

Log in with Apple

OR

Register for free!

Join TrailLink (a non-profit) to view more than 40,000 miles of trail maps and more!

Register with Google

Register with Apple

OR

Your account has been deleted.